Skip Top Navigation Skip to Content
(BEFORE) The 3/4 of a mile long passing lane begins here at MP 34.75 (On the right - eastbound).(BEFORE) The passing lane ends here at MP 35.25 Paving the new lane.Finishing the new shoulder.The new lane required attention to drainage issues.Final striping when the lane was finished.