Skip Top Navigation

SR 26 - Palouse River Bridge Deck Repair - Complete August 2009

Status

Summer 2009

  • Awarded to Penhall Company dba Concrete Barrier Inc. of Mulkiteo, WA with a construction bid of $445,345.
  • Complete

The driving surface of this bridge on SR 26 will be repaired and resurfaced. Drivers will see some lane restrictions during construction.

Why is WSDOT repairing this bridge?
Routine wear requires that these bridges be repaired to preserve the underlying support structure and extend their useful life.

The End Result
Smoother ride and preserved structure.

Project Benefits
This project protects the investment in the transportation system and will create about a half dozen jobs during construction.

What is the project timeline?
Construction started March 23, 2009 and is scheduled for completion in mid-May.

Financial Information
This project is funded through the following sources:

  • Federal Funds - $445,345
  • Total Funding From All Sources - $445,345

How can I get more information?
Contact:

Project Engineer:
Darrel McCallum , P.E.
WSDOT Project Office
2714 N. Mayfair
Spokane, WA 99207
Phone: (509) 323-8412
E-mail: mailto:mccalld@wsdot.wa.gov

back to top