Skip Top Navigation

SR 26 Grant County Line to SR 17 Paving Map

The orange line shows the 11 miles being paved
11 miles of SR 26 are being paved from 9 miles west of Othello to 2 miles east, from the Grant County Line at Milepost 31 to SR 17 at Milepost 42.