Skip Top Navigation

SR 202 - SR 203 to W North Bend Way Construction Photos

Wastson Paving crews lay down new asphalt.

Watson Asphalt Paving Co. crews place new asphalt between Fall City and Snoqualmie Falls.


n/a
Rolling trucks smooth out the new surface.

WSDOT project inspector checks the temperature of the asphalt.
A WSDOT project inspector uses a temperature gun to check the surface temperature of the
asphalt.