A massive rock slide destroyed SR 20 east of Newhalem on November 9, 2003. The rock slide left the hillside above the highway extremely unstable and blocked access to the town of Diablo.

This project cut the hillside back from the highway and built a large rock catching ditch to protect the road and drivers.

How You Benefit
Cross GlyphImproves Safety
Reduces the chance of motorists being hit by falling rocks or running into them on the roadway, and protects the road from damage.

Partnerships & Cooperation
Whatcom County was declared a disaster area by the governor in October 2003. The Federal Highway Administration later determined that the November 9 rock slide was a result of the heavy rains in October. Thus, WSDOT was able to access emergency funding from the federal government to repair the rock slide damage.

Funding
This project was funded through the following fund sources:

  • Existing Funds - $13,257,000
  • Total Funding Available From All Sources - $13,257,000

Contact Us

Project Engineer
Dave Crisman
WSDOT Mount Vernon Project Office
1109 East Hickox Road
Mount Vernon, WA 98274
Phone: (360) 428-1593
E-mail:CrismaD@wsdot.wa.gov

or

Public Information Officer Dustin Terpening
WSDOT Mt. Baker Headquarters
1043 Goldenrod Road, Suite 101
Burlington, WA 98233-3415
Phone: (360) 757-5997
E-mail: Terpenid@wsdot.wa.gov

back to top