Design Construction Impacts
Retaining walls will be constructed to minimize impacts to forested wetlands and to mitigate unstable slopes. Construction of a temporaty alignment will be needed to accomodate bridge construction.
A Cost Risk Assessment (CRA) workshop preformed in April 2004 and subsequent in depth reviews of the results have identified a new total project cost of $19.8 million, an increase of $5.4 million. The project team is investigating measures to offset these cost increases.
|