Winter 2007 - Timber is laid down in preparation for pouring the concrete foundation for the guardrails near Cornet Bay Road. |

Winter 2007 - The concrete foundation that will be poured adds more strength to the bollards that will support the new guardrails. |

March 2008 - A worker secures rebar inside the metal framework of a new bollard.
|

March 2008 - A worker fastens rebar together inside the bollard framework. |

Winter 2007 - Framing for the sidewalks is in place at the intersection of SR20 and Cornet Bay Road. |

Winter 2007 - The foundation and bollards are poured here looking south toward Corney Bay Road. Stonework is now ready to begin. |

March 2008 - A worker chips pieces off a rock before mortaring it around the concrete railing support. The stones are added so that the supports retain their historical characteristics. |

March 2008 - Pieces of rock are mortared into place around the concrete framework of the bollard. Many of the rocks were used in the construction of the original stone bollards in the 1930s. |

March 2008 - A worker mortars stones into place on the outside of a new concrete and steel bollard. |

March 2008 - A worker smooths out the mortar between stones that surround a new concrete bollard. |

January 2008 - Stonework on the bollards is complete. Log guardrails will soon be installed. |

January 2008 - Workers begin installing the new log guardrails near Cornet Bay Road. |

January 2008 - A completed stretch of guardrail. Note the steel backing plate that reinforces the log guardrail. |
|