Crews drilled holes in the concrete
Repair work began Feb. 4 - Crews drilled 6-inch holes in the concrete slab so they could place concrete fill behind the damaged wall.

Retaining wall at the Cedar River
The flooded Cedar River caused the soil underneath the retaining wall to erode.

Shoulder on northbound SR 169