We will repave SR 167 between I-405 and Grady Way in Renton.



We will repave SR 509 between S. 174th to S. Normandy Road.


Pavement life cycle graphic

To maximize our resources and limit interruptions to traffic, we try to repave roadways at just the right time. We try to catch roadways when they have some damage, but are not so damaged that they will require additional repairs. If we wait too long to repave, the damage to the roadway can lead to even greater costs. Learn more about WSDOT's pavement management program.