SR 160 - SR 16 to Long Lake Road

Quarterly Project Report Update for Quarter Ending March 2006

Project Title & Location

SR 160 - SR 16 to Long Lake Road

Project Description
This safety improvement project flattens slopes from SR 16 to Phillips Road vicinity and increases road shoulder widths to 4 feet (6 feet between Estonia and Brasch). A two-way left-turn lane will be added from Fred Meyer to Brasch and left turn lanes will be added at Phillips Road. The project also creates flat bottom ditches for storage of treatment for runoff.

Contractor/Consultant
Project not advertised or awarded

Recent Progress

This project is currently in the right of way purchase phase.

Design Construction Impacts

This project is currently on the shelf pending the anticipated 2009 advertisement date.  Right of way is proceeding due to the large number of parcels affected by this project.  Coordination is continuing with the utility companies, especially Puget Sound Energy, on relocation of the utilities affected by the project.

Environmental Impacts / Compliance

As designed, this project has minimal impacts environmentally.  The impacts will have to be reassessed and permits, if needed, attained prior to advertisement to comply with any changes in the laws or regulations at that time.

Impacts to Traffic

When construction begins it is anticipated that there will be some lane restrictions during the widening and slope flattening stages.  It is anticipated that there will also be one-lane alternating traffic intermittently through this phase.  There will be one-lane alternating traffic during the paving of the project lasting approximately two weeks.

Project Milestones Scheduled Attained Milestone Outlook
Environmental Clearance  Fall 2008 Environmental and Hydraulic design is complete and awaiting approval.  Review will be required prior to advertising.
Right of Way complete Fall 2008 Date has not been established; need this before utility relocation can be accomplished.  It is anticipated that right of way purchase may be completed as early as 2007.
Utility Relocations complete 12/1/2008 Need to complete to advertise
Contract Advertisement 1/05/2009 Contract advertisement is on track.
Estimated Construction Completion 3/1/2010
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering $0.57  11.0%
Right-of-Way $2.01  38.9%
Construction $2.59  50.1%
Funded Project Costs $5.17 100.0%

Nickel funds included in above costs

$3.88 77.2%

2005 Transportation Partnership Account

  For more information, go to www.wsdot.wa.gov/projects

Amity Trowbridge, Project Engineer, (360) 874-3000, amityt@wsdot.wa.gov