Recent Progress
Design of stormwater treatment is being finalized. Consultant has been hired to investigate the northern stormwater treatment pond due to the artesian water within the area. Wetland mitigation agreement being finalized. Wall types, size, and location have been finalized. Joint Public Notice for environmental permits submitted on August 21, 2007.
|
|
Environmental Impacts / Compliance
Two fish barriers are being remediated. Cultural resource study completed for project limits. All required permits have been applied for.
|
Impacts to Traffic
Four lanes of SR 16 will be provided throughout the duration of the project. Traffic speeds through the area will be reduced to 40 MPH. With the exception of Emergency Vehicles, access at Burley Olalla Road, to and from SR 16 is anticipated to be closed for the duration of the project.
|