Project Title & Location
SR 14/Camas Washougal - Add Lanes and Build Interchange
|
Project Description
Widen SR 14 to four lanes from the east end of the West Camas Slough Bridge to Union St, and construct a new split diamond interchange at Union St and 2nd St. This project will improve safety and capacity by eliminating conflicting movements and queuing at intersections, and separating traffic with median barrier.
|
|
Contractor/Consultant
Skillings-Connolly Inc. for environmental reports.
|
|
Recent Progress
To stay within budget and retain the desired safety and mobility improvements, this project has been revised. The West Camas Slough Bridge will not be widened to four lanes, but widened enough to provide a wider shoulder and median barrier. Also a half interchange will be added at 2nd Ave. to provide safe and efficient access to Camas, Washougal and the Port.
|
|
Design Construction Impacts
The design team is in the preliminary phase of construction staging and traffic control design. They will work to minimize traffic impacts to SR 14 and city streets as much as possible.
|
|
Environmental Impacts / Compliance
Major work activities associated with environmental documentation are anticipated to be completed in 2009. The Biological Assessment with formal consultation has been submitted.
|
Impacts to Traffic
The design team is currently assessing these impacts. The team will minimize impacts as much as possible.
|