SR 14 - Camas-Washougal Widening & Interchange

Quarterly Project Report Update for Quarter Ending March 2007

Project Title & Location
SR 14/Camas Washougal - Add Lanes and Build Interchange

Project Description
Widen SR 14 to four lanes from 6th Ave. to SR 500/Union Road to relieve congestion. Included in the project will be new bridges over the East and West Camas Sloughs and an interchange will be constructed at SR 500/Union Road. This project will reduce collisions by restricting turns at the 2nd Street and 6th Street intersections, and placing median barrier on SR 14.

Contractor/Consultant
Skillings-Connolly Inc.

Recent Progress
A Value Engineering (VE) study was conducted on this project in March. The VE recommendation is currently being evaluated by WSDOT with input from the project stake holders.

Design Construction Impacts
The design team will assess these impacts in future constructability meetings. 

Environmental Impacts / Compliance
Environmental documentation is expected to be complete by late 2007.

Impacts to Traffic
The design team is currently assessing these impacts. The team will minimize impacts as much as possible.

Project Milestones Scheduled Attained Milestone Outlook
Preliminary Engineering July 2005 December 2005
Environmental Documentation Complete April 2008
Right of Way Certification April 2009
Advertisement January 2010
Operationally Complete November 2012
Project Cost Summary: Dollars in
millions
Percent
of Total

Planned vs. Actual Expenditures
(Total Project Cost)
Project Expenditure Chart

Preliminary Engineering $3.5 9%
Right-of-Way $3.5 9%
Construction $33.0 82%
Funded Project Costs $40.0 100%

Nickel funds included in above costs

2005 Transportation Partnership Account

$40.0 100%

  For more information, go to www.wsdot.wa.gov/projects

Project costs do not reflect the Governor's 2007-09 Proposed Budget

Kevin Miller, WSDOT Area Engineer, (360) 905-1565 or e-mail: swClark@wsdot.wa.gov