Bridge Site East-half replacement, west-half widening, approach span replacement.
|
 |
Pontoon Construction Pontoon construction at Concrete Technology in Tacoma, Wash.
|

|
Pontoon Float-outs The progression of floating pontoons out of the graving dock in Tacoma, Wash.
|
 |
Pontoon Assembly, Outfitting & Testing The refurbishing of three pontoons from the 1980s, assembly of 17 east-half pontoons into three sections, construction of columns and roadway on pontoons and testing of east-half draw span in Seattle, Wash.
|

|
Anchor Construction & Setting Anchor construction at Todd Shipyards in Seattle, Wash.
|
 |
Historical Archives 1958 bridge construction; 1983 bridge construction; 1973 bridge failure; R,S,T pontoons in Port Gamble Bay.
|