SR 104- Hood Canal Bridge - Project Library


Hood Canal Bridge 2007 Public Opinion Survey Report
(pdf, 209 KB) Survey information gathered by conducting phone interviews in June 2007 with people residing in Kitsap, Jefferson and Clallam counties.

Hood Canal Bridge Closure Commitment Plan
(pdf, 582 KB)  The mitigation plan recommended by the Peninsula Regional Transportation and Planning Organization to assist bridge users in getting to their destination during the six-week bridge closure in 2009.

Hood Canal Bridge August 2005 Closures Public Outreach Report (pdf, 868 KB) This report details the public information and outreach program that took place throughout spring and summer 2005 in advance of, and during, two August closures. Includes August 2005 Closure Analysis/Mitigation Travel Demand update.

Hood Canal Bridge Site Selection Report
(pdf, 3,721 KB) Initial engineering and environmental review of 18 sites graving dock and pontoon construction proposals.

Statement About Termination of Work at the Port Angeles Graving Dock Site (pdf, 19 KB) Official statement regarding the suspension of pontoon and anchor construction at the Port Angeles Harbor site.

2003 HCB Public Opinion Survey report (pdf, 189 KB) Survey information gathered by conducting interviews with people residing in Jefferson, Clallam and Kitsap counties.

East-Half Replacement Closure Mitigation Plan Final Report (pdf, 1,510 KB) This report is a continuation of efforts completed during Phase I of the Closure Mitigation Plan (Preferred Options) by the Washington State Department of Transportation (WSDOT) and the Peninsula Regional Transportation Planning Organization (PRTPO). The eleven (11) Phase I preferred options for mitigating traveler disruptions were reviewed and conclusions about their efficacy determined. The report defines the six final strategies in sufficient detail that services associated with each strategy could be identified and planned for prior to bridge closure.

2002 Hood Canal Bridge Environmental Assessment (pdf, 12,812 KB)  This assessment was prepared to assist federal agency review required under the Endangered Species Act (ESA) to ensure that the Federal Highway Administration (FHWA) does not fund any WSDOT actions that may jeopardize the continued existence of endangered or threatened species or their critical habitats. 

2001 Bridge Closure Survey
(pdf, 233 KB) The Washington State Department of Transportation (WSDOT) mailed 22,178 surveys to Hood Canal Bridge users to determine what transportation facilities and services commuters will use when the bridge is closed for reconstruction.

2000 Closure Mitigation Plan - Preferred Options (pdf, 1,175 KB) The Hood Canal Bridge Replacement Advisory Committee (HCBRAC) brainstormed 62 transportation options to help address transportation demand during the bridge closure. As a first step toward paring-down the number of options, the committee combined options that were inter-dependent, and refined others to accommodate bridge users’ needs – 48 options were presented to the HCBRSC for review.

1998 Origin and Destination Study (pdf, 2,073 KB) The Washington State Department of Transportation (WSDOT) contracted with ECONorthwest (ECO) to conduct a survey of Hood Canal Bridge users to determine trip patterns, frequency, and purpose.

1997 East-Half Replacement Study (pdf, 1,218 KB) The purpose of this report on the William A. Bugge Bridge east-half floating portion is to identify the factors affecting the remaining effective service life and to evaluate the cost effectiveness of rehabilitation verses replacement.