WSDOT Projects

text size: T T T

SR 104- Hood Canal Bridge R,S,T Refab Photo Gallery



Rebar. Crews prepare for a concrete deck pour by wetting surfaces and doing final checks. July 2007.


Deck Pour. Crews condense and spread concrete for a deck pour. July 2007.


Flyover. Crews use a crane to remove the Bidwell used to smooth the concrete on a deck pour.


<< Assembly Photos