WSDOT Projects

text size: T T T

SR 104- Hood Canal Bridge Pontoon Photo Gallery

Pouring
Pouring: Workers direct the flow of concrete into the pontoon woods forms through a large, heavy hose. June 2006

Teamwork
Teamwork: Crews direct the wet concrete to the exact location while monitoring drying rate, temperature and other details. June 2006

Controller
Controller: Watching from the top of the pontoon, the controller moves the hose around the pontoon cell during a concrete pour. June 2006


<< Pontoon Photo Gallery