WSDOT Projects

text size: T T T

SR 104- Hood Canal Bridge Pontoon Photo Gallery

Cranes Up: Tower cranes "fly in" materials - move forms, rebar and other supplies - from storage areas to inside the graving dock. Moving this volume of materials takes tremendous planning by engineers and craft superintendents. March 2006


Rebar Flown: Tower crane operators perform the delicate operation of lowering prefabricated rebar mats into place. Prefabricating materials allowed crews to work more efficiently, saving both time and costs. March 2006


Floor Form: The tower crane operator lowers a wood pontoon floor form into pontoon PA to prepare for the first concrete floor pour. March 2006


<< Pontoon Photo Gallery