Last major pour. Crews pour concrete for the first top deck of pontoon PB. September 2006.
|
 |
Post-tensioning. Ironworker cuts post tensioning strands after strands are tightened and grouted into place. October 2006.
|

|
Flexi float. Tower crane operator lowers flexi floats between pontoons PA and PB. Flexi floats add additional buoyancy that will help the pontoons float out of the shallow graving dock. October 2006.
|