SR 104 - Hood Canal Bridge Pontoon Photo Gallery

Pontoon Construction In Tacoma

Travel from atop the 140-foot-tall tower crane to underground crawlspaces to see the pontoon construction through the eyes of WSDOT and Kiewit-General engineers and crews.  

These photos illustrate the construction process for building 14 new Hood Canal Bridge pontoons at the 150-foot wide by 465-foot long Concrete Technology graving dock site in Tacoma, Washington.

First Cycle: Pontoons PA, PB, Q
March - December 2006

There are 30 photos in this photo gallery. Click on photos to enlarge and view captions.

wood bases preparations forms in Cranes are up rebar is flown in by crane flying base
Prefabrication
01/06
Preparations 02/06 Forms In 03/06 Cranes Up 03/06 Rebar Flown
03/06
Floor Form
03/06
April 2006, cuts first concrete pour first wall measurements hatch rebar anchor gallery
Precise Cuts
04/06
First Concrete
04/06
First Wall 05/06 Measuring
06/06
Hatch Rebar
06/06
Anchor Gallery 06/06
pouring concrete teamwork controller inspections flag waving in Tacoma aerial
Pouring
06/06
Teamwork
06/06
Controller
06/06
Gallery Pour
06/06
Flag Waves
07/06
Aerial 
07/06 
Skyline Overview of Tacoma Graving Dock Inspections safety Materials Knuckle Joint





Skyline
07/06
Overview 
07/ 06
Safety
08/06
Inspections
07/06
Materials
08/06
Knuckle
08/06

First Top Deck Pour 08/06

HPU
08/06

Aerial View
09/06

Last Major Pour
09/06

Post- Tensioning
10/06

Flexi Float
10/06


Second Cycle: Pontoons NA, NB, YD, YE, YF
December 2006 - July 2007

There are 10 photos in this photo gallery. Click on photos to enlarge and view captions.

         
Forms
12/06
Wall Rebar
1/07
Cells
2/07
Bottom Pour
2/07
Clearance
3/07
Wall Pour
4/07
 



Top Rebar
5/07
Top Deck
7/07
Finishing
7/07
Second Float-out
7/07


Third Cycle: Pontoons ZC, ZD, V, X
July 2007 - February 2008

There are 9 photos in this photo gallery. Click on photos to enlarge and view captions.

Pre-cast
 7/07
Forms
8/07
Driving Over
8/07 
Arrival
8/07 
Placement
 8/07
Laydown
 8/07
Materials
8/07
Wall
7/07 
Empty
 8/07

 


Fourth Cycle: Pontoons U, W
February 2008 - August 2008