Pontoon Construction In Tacoma
Travel from atop the 140-foot-tall tower crane to underground crawlspaces to see the pontoon construction through the eyes of WSDOT and Kiewit-General engineers and crews.
These photos illustrate the construction process for building 14 new Hood Canal Bridge pontoons at the 150-foot wide by 465-foot long Concrete Technology graving dock site in Tacoma, Washington.
First Cycle: Pontoons PA, PB, Q
March - December 2006
There are 30 photos in this photo gallery. Click on photos to enlarge and view captions.
 |
 |
 |
 |
 |
 |
Prefabrication 01/06 |
Preparations 02/06 |
Forms In 03/06 |
Cranes Up 03/06 |
Rebar Flown 03/06 |
Floor Form 03/06 |
 |
 |
 |
 |
 |
 |
Precise Cuts 04/06 |
First Concrete 04/06 |
First Wall 05/06 |
Measuring 06/06 |
Hatch Rebar 06/06 |
Anchor Gallery 06/06 |
 |
 |
 |
 |
 |
 |
Pouring 06/06 |
Teamwork 06/06 |
Controller 06/06 |
Gallery Pour 06/06 |
Flag Waves 07/06 |
Aerial 07/06
|
 |
 |
 |
 |
 |
 |
|
|
|
|
|
|
|
Skyline 07/06 |
Overview 07/ 06
|
Safety 08/06 |
Inspections 07/06 |
Materials 08/06 |
Knuckle 08/06
|
 First Top Deck Pour 08/06
|
 HPU 08/06
|
 Aerial View 09/06
|
 Last Major Pour 09/06 |
 Post- Tensioning 10/06
|
 Flexi Float 10/06 |
Second Cycle: Pontoons NA, NB, YD, YE, YF
December 2006 - July 2007
There are 10 photos in this photo gallery. Click on photos to enlarge and view captions.
|
|
|
|
|
 |
Forms 12/06 |
Wall Rebar 1/07 |
Cells 2/07 |
Bottom Pour 2/07 |
Clearance 3/07 |
Wall Pour 4/07 |
|
 |

|

|
|
|
Top Rebar 5/07 |
Top Deck 7/07 |
Finishing 7/07 |
Second Float-out 7/07 |
|
|
Third Cycle: Pontoons ZC, ZD, V, X
July 2007 - February 2008
There are 9 photos in this photo gallery. Click on photos to enlarge and view captions.
 |
 |
 |
 |
 |
 |
Pre-cast 7/07 |
Forms 8/07 |
Driving Over 8/07 |
Arrival 8/07 |
Placement 8/07 |
Laydown 8/07 |
 |
 |
 |
|
|
|
Materials 8/07 |
Wall 7/07 |
Empty 8/07 |
|
|
|
Fourth Cycle: Pontoons U, W
February 2008 - August 2008
<< Return to Hood Canal Bridge Photo Gallery