Hatch Opening.  An inspector enters a pontoon cell through one of the watertight hatches on the top of the pontoon.  December 6, 2006.

Caption below picture.
Cell Inspections.  As water fills the graving dock, inspectors check each and every cell on the three pontoons- searching for any signs of leaks or damage that need to be repaired.  December 6, 2006.

Caption below picture.
Waterline.  The water from Blair Waterway fills the graving dock to about 15 feet.  This waterline attached to the end of one of the pontoons shows the current draft of the pontoon, or how much of the pontoon is underwater.  December 6, 2006.