WSDOT Projects

text size: T T T

SR 104- Hood Canal Bridge Anchor Photo Gallery



Anchors on Dry Dock.  Six of ten anchors in first cycle of anchor construction are being constructed at the dry dock in Seattle, Wash.  January 2007.


Walls Complete.  Crews complete the upper and lower wall pours on a 46-foot diameter anchor.  January 2007.


Upper Spokes.  Crews pour concrete in the upper spokes inside the bowl-shaped anchor.  February 2007.

<< Anchor Photo Gallery