SR 104- Hood Canal Bridge Anchor Photo Gallery



Wall Rebar. 
Worker assembles rebar for 46-foot anchor wall.  November 2006.


Lower Wall Pour.  Workers pour concrete for the first 14-foot wall section in the first cycle.  The anchor will be 29-feet high when completed.  November 2006.


Lower Wall Pour.  Workers pour concrete for the lower wall on a 46-foot in diameter anchor.  The two-foot base slab is already in place on the anchor floor.  November 2006.