SR 104 - Hood Canal Bridge Anchor Photo Gallery



Finishing. Crews place concrete for the base slab of a 46-foot anchor. April 2007.



Finishing 2. Crews place concrete for the base slab of a 46-foot anchor. April 2007.


Upper Wall. Crews place concrete for the upper wall of a 56-foot diameter anchor. May 2007.