Skip Top Navigation

SR 104- Hood Canal Bridge Anchor Photo Gallery




Floating Dry Dock. The floating dry dock, "Emerald Sea" floats into Todd Pacific Shipyards.  Crews will build the first cycle of 10 anchors on this dock.  July 2006.


Floor Forms. Wood forms are built to form the bottom of the anchors.  August 2006.


Footing. Ironworker installs rebar for anchor footing, an "x" shaped anchor base.  September 2006.

<< Anchor Photo Gallery