39th Street closure map

Currently, people who drive or walk through the Vancouver rail yard on West 39th Street must cross seven sets of railroad tracks. Construction of bypass tracks will increase this total to nine sets of tracks. To enhance safety at this crossing, a vehicle/pedestrian overpass (bridge) will be constructed over the rail tracks.
How can I get more information?
Contact:
Kevin Jeffers, P.E. – Rail Bypass Project Manager
WSDOT State Rail and Marine Office
PO Box 47407
Olympia, WA 98504-7407
Phone: 360.705.7982
E-mail: Kevin Jeffers
Joanna Lowrey, P.E. – West 39th Street Bridge Project
WSDOT Columbia Gorge Area Office
P.O. Box 1709
Vancouver, WA 98668-1709
Phone: 360.759.1310, or toll-free at 1-866-279-0730
E-mail: WSDOT Golumbia Gorge Area Office
Jeff Schmidt, P.E.
City of Vancouver
Phone: 360.696.8290, ext. 8581