Project Title & Location
Mt. Vernon Siding Upgrade – Mt. Vernon
|
Project Description
Completes contractual commitments with the host railroad to upgrade the existing rail siding for on-time reliability. Guarantees the continued operation of the second train on this route, currently operating between Seattle and Bellingham.
|
|
Environmental Impacts / Compliance
The first phase of the project, the upgrade of the existing track, required only documentation for compliance with both the National and State Environmental Policy Acts. The second phase of the project, the siding extension, will require a biological assessment to determine its effects on endangered species. In February 2006 a wetland was discovered; a wetland fill permit has been processed.
|
Impacts to Traffic
There may be some brief work windows that may affect rail operation for both freight and passenger trains as old signals are replaced with new signals. Amtrak Cascades passengers may experience short delays on trains traveling between Vancouver or Bellingham and Seattle. The Hickox Road at-grade crossing may need to be closed to allow the siding extension to be used.
|