Cost Risk Assessment

text size: T T T

CRA / CEVP Workshop Prep Packets

Workshop Request Form rev 07-FEB-2008.doc
This form serves as an official request to begin coordinating a CRA/CEVP workshop. Allow a minimum of 8 weeks for coordination of pre-workshop and workshop activities. When requesting dates for the workshop please refer to our "WSDOT re VERA" calendar on Outlook to make sure there are no potential conflicts.

Before a workshop can be held the appropriate preparation of materials, coordination and scheduling, must take place, including materials such as:  1) Project Management Plan must be up-to-date.  2) Scope, Schedule, Project Cost estimate w/backup must be up-to-date.  3) Participants should review the workshop guidelines.

WSDOT Guidelines for CRA-CEVP Workshops 2008-JAN-11.doc (512 kb)

CREM Glossary 2008-JUN.doc (370 kb)

Estimating Tips and Watchouts.doc (84 kb)

PREP AGENDA Template rev 2007-July.doc (58 kb)

WORKSHOP AGENDA Template rev 2007-May.doc (120 kb)

Particpation Matrix Template Rev 2007-June.xls (39 kb)

Project Estimate Basis Form rev Aug 2006 (doc 132 kb)

Sample Risk Elements (doc 43 kb)

COMMON ASSUMPTIONS 10-Sep-2007 with IL.pdf (220 kb)

CRA CEVP Workshop Flowchart.doc (50 kb)

GENERIC REPORT Table of Contents rev 2008-January.doc (66kb)

ONE-PAGER Template Feb-2008.doc (180 kb)

Post Workshop Evaluation Form REV 31-AUG-2006.doc (60 kb)

Risk Breakdown Structrure 2008-June-02.pdf

Some of these documents are in Microsoft Word format. if you do not have Microsoft Word you can download a reader to view the documents.