Washington State Department of Transportation
WSDOT NewsSearchContact WSDOTWSDOT Home
Traffic & RoadsProjectsBusinessEnvironmentalMaps & Data
Accountability
 
  Project Management
  Project Management Process
  Project Delivery Information System
  Master Deliverables List
  Project Management Training
  Project Legal Requirements
 
 


Project Legal Requirements

CONTRACTING

back to flowchart

CONTRACTING
Requirement Description Authority
CFR, RCW, WAC
Additional Information MDL No.
Notification of Differing Site Conditions During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions. 23 CFR 635.109(1) Notification before the site is disturbed and before the affected work is performed.  

back to Project Delivery Process

download Excel spreadsheet

top
 


  Copyright WSDOT © 2005

    Traffic & Roads | Search | Contact WSDOT | WSDOT Business | WSDOT Home