Skip Top Navigation

Rutter Parkway

Project location map

Overview
This project will repair spalled concrete piles. Pre-fabricated steel or fiberglass sleeves will be attached to the piles and grouted in place. 22 piles will be repaired. The deck slab will be milled and overlaid with 1 1/2" of latex modified concrete. Asphalt approaches will be paved and raised 1" to match the grade of the new overlay.

Why are we Building This Project?
The project will extend the useful life of the bridge by providing protection for the piers and installing a concrete overlay on the bridge deck.

How can I get more information?
Contact:

Todd Mielke
509-477-7433
bhemmings@spokanecounty.org