Rainier Ave S (SR 167) Improvements Project - Phase 1: Shattuck Avenue Stormwater Bypass

Project location map

Overview
The Rainier Ave S Improvements Project includes adding Business Access and Transit (BAT) lanes, adding left turn lanes at intersections, widening sidewalks with street landscaping, adding pedestrian scale lighting and landscaped median barriers. Phase 1, the Shattuck Ave S stormdrain project will provide a bypass for surface water draining into the Rainier Ave S pump station. The bypass system will provide a considerable cost savings by avoiding replacement/upgrades to the existing stormwater pump station located on Rainier Ave.

Why are we Building This Project?
Supports alternatives to driving alone and improves safety for transportation system users.