Overview
Repair pavement failures, pre-level and overlay surface with asphalt concrete pavement. Project length is 1.8 miles.

Why are we Building This Project?
West Little Island Road currently has a very poor pavement condition. Steps must be taken to prolong its life, or deterioration will accelerate. The County has sufficient funds to complete a pre-level placement of asphalt in some areas, then place a bituminous surface treatment, however this would be a stop-gap measure. Investing in an asphalt concrete overlay would provide the structural surface improvement that is needed to help reduce future road maintenance costs.  This infrastructure investment will restore the road to its original condition. 