5 Mile + Strong Road

Project location map

Overview
Reconstruct the existing roadway by using the cement treated base process for strengthening the base and by placing a 3" lift of Hot Mix Asphalt. Horizontal and vertical alignment to remain the same. The new roadway will match into the existing widened section that developers have built along the project frontage.

Why are we Building This Project?
This project uses a cost effective strategy to reconstruct the existing road by strengthening the base with the cement treated base process along with placing a 3" lift of asphalt.