230th Reconstruction Project (56th to 61st Avenues)

Overview
The project will entirely reconstruct an existing unimproved two lane asphalt collector street; including new curb, gutter, sidewalk and drainage facilities. Continuous bike lanes will be added, as well as intermittent parking lanes along both sides of the street.

Why are we Building This Project? 
The project will rehabilitate failing pavement, alleviate vertical and horizontal design deficiencies, and bring the roadway to current design standards.

How can I get more information?
Contact: 

Kirk Roberts
425-744-6275
kroberts@ci.mlt.wa.us