Status

March 2017

  •  Awarded to Kerr Contractors Oregon, Inc. of Woodburn, OR with a construction bid of $9,721,681.

Interstate 90 will be resurfaced with hot mix asphalt.

Why is WSDOT Resurfacing this highway?
High traffic volumes with normal wear and tear has deteriorated the pavement surface.

The End Result
A smoother roadway and protection for the underlying highway structure.

Project Benefits
A better experience for drivers with a reduced need for repairs and patching.

What is the project timeline?
The project will be designed, advertised for bids and constructed during 2017.

Financial Information

Financial Data for PIN 609023T
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $13,850
CWA $0
Total $13,850

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Chad Simonson, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA  99207
509-324-6000

back to top