I-90 - West of George - Paving


Project Area Map
View entire map.  This I-90 paving project, from MP 137.82 to MP 148.45, is located in Grant County.

Right lane heading eastbound to be paved
View entire photo.  The right lane heading eastbound will be paved.
Project Facts
  • This project paves 10.8 miles of the right lane heading eastbound between Vantage and George.
  • Construction is scheduled for the spring of 2008.
  • Design work is currently underway.

Project Status

Spring 2008

Construction begins this spring and should take about six weeks to complete.

This preservation project paves 10.8 miles of the right lane heading eastbound between Vantage and George.

Why is WSDOT paving I-90?
The right lane heading eastbound between Vantage and George is due for pavement restoration due to deterioration.

The End Result
The project will prevent further deterioration to the existing roadway at the least possible "life cycle" cost.

Project Benefits

  • Extends roadway life.
  • Provides a smoother driving surface.

What is the project timeline?
Construction begins this spring and should take 30 working days - about six weeks - to complete.

Public Involvement
Your thoughts and ideas are important to us.  If you have questions or concerns about this project, please contact us.  Contact information is listed below.

Environmental Protection
All applicable environmental laws and guidelines are being followed.  No environmental permits are anticipated to be required for this project.
Please visit the WSDOT Environmental Services Web site for more information.

Increasing safety is one of our priorities
Safety for the public and the construction workers is paramount while the work is underway.  A comprehensive traffic control plan will be prepared to protect travelers and workers.

Will this project impact tribal resources?
No impacts have been identified.  WSDOT addresses the concerns of tribal nations using the process outlined in Section 106 of the National Historic Preservation Act and WSDOT Tribal Consultation Policy adoped in 2003 by the Transportation Commission as part of the WSDOT Centennial Accord Plan.

Financial Information
This project was advertised for private contractor bids on September 24th and bids were opened on October 25th. Contract #7419 was awarded to Central Washington Asphalt on October 29th, 2007 for $1,359,595.95, 9% under the engineering estimate.

This project is funded through the following sources:

  • Pre-Existing Gas Tax - $2.1 million
  • Total funding from all sources - $2.1 million

How can I get more information?
Contact:
Mike Fleming, Project Engineer
WSDOT North Central Region
P.O. Box 98
Wenatchee, WA 98807
Phone:  (509) 667-2870 or toll free (888) 461-8816
Email:  fleminm@wsdot.wa.gov

back to top