I-90 Project Phase 1C Information
Existing DTM Surfaces
Proposed DTM Surfaces
Proposed Alignments
Cross Sections
Addendum #1 Cross Sections
Addendum #3 Cross Sections
Addendum #6 Cross Sections
Proposed Alignments
Staging Alignments
Avalanche Reports
Geotech Information
Phase 1C Roadway Geotechnical Engineering Report
Slide Curve Rock Slope Design
Phase 1C Slope Engineering Report
Crystal Springs Stockpile Site
I-90 Project Phase 1B Information
Geotechnical Reports
I-90 Project Phase 1A Information
• Pit Site Report (pdf 45.50 mb)
• Crystal Springs Detour Geotech Report (pdf 18.70 mb)