Skip Top Navigation

I-90 - SR 202 I/C to S Fork Snoqualmie River - Paving - Complete September 2016

Project Status - Complete
A small map showing the location of the paving project on I-90 between SR 202 and S. Fork Snoqualmie River near North Bend.
View larger project map

A small photo showing the condition of the pavement on I-90 near SR 202 where crews will repave and improve the concrete near the expansion joint in 2016.
Aging pavement was repaired near the SR 202 bridge near North Bend.

Overview
WSDOT contractor crews repaved and restriped both directions of I-90 from South Fork Snoqualmie River to SR 202 near North Bend.

Five new concrete panels and new rumble strips were also installed.

How You Benefit
Cross GlyphImproves Safety
Removing cracks, potholes and wheel ruts reduces the chance for water to pool on the roadway, creating a safer and smoother ride for drivers.
Dollar Sign Glyph Economic Incentive
The new pavement will reduce the need for maintenance and emergency road repairs, saving money long term.

Partnerships & Cooperation
WSDOT worked closely with the cities of Snoqualmie and North Bend during the project.

Funding

Financial Data for PIN 109079B
Funding Source  Amount ($ in thousands)
2003 Gas Tax (Nickel Funding)  $0
2005 Gas Tax (TPA)  $0
Pre-Existing Funds (PEF)  $2,514
CWA  $0
Total  $2,514

Contact Us
WSDOT communications
15700 Dayton Avenue North
Seattle, WA 98133
206-440-4697
NWPublicAffairs@wsdot.wa.gov

back to top