After construction

Crews repaved the I-90 Bellevue Way interchange

Crews also replaced the guardrail in the area.

Before construction

The pavement at the I-90/Bellevue Way SE interchange was rutted and cracked.

Repaving the ramps will reduce the need for costly and inconvenient repairs.
