I-82 - US 12 to Yakima Ave - Corridor Improvements


WSDOT plans to make improvements along the I-82 corridor near Yakima Avenue.




Status

Spring 2016

Yakima, Yakima County and the Washington State Department of Transportation have a funded plan to improve access to the Cascade Mill District to encourage economic growth.

Yakima
Improve roadway infrastructure through the Cascade Mill District
Yakima County 
Provide an alternate route to and from Terrace Heights
WSDOT
Increase capacity and improve access on and off I-82.

Why is WSDOT proposing to widen I-82 in the Yakima Gateway vicinity?

Traffic volumes are increasing on I-82 through Yakima with heavy morning and evening peaks. Substantial traffic merges with I-82 at the US 12 interchange.

The End Result

  • This project adds a third lane in each direction on I-82 in Yakima between the US 12 interchange and the Yakima Avenue interchange.
  • This project includes replacing underpass bridges at the Boise Mill property and at the Columbia Basin Railroad crossing.

Project Benefits

  • Additional lanes will reduce congestion and reduce the risk of collisions.
  • Improved access to the interstate corridor is crucial to ensure enhanced economic vitality for this area.

What is the project timeline?

  • This project is in the planning/preliminary design stage.
  • New revenue is needed to complete the design, right of way acquisition and construction of these important improvements.
  • Approval from the federal highway administration is also required to complete these improvements.

Financial Information

Financial Data for PIN 508208O
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $2,000
Total $2,000

The cost estimate for this project is in the range of $45-$55 million.