Skip Top Navigation

I-82 - US 12 to Valley Mall Blvd Vicinity - Paving

Overview
Crews replaced the rough and deterorating asphalt pavement by grinding and replacing the top layer of the eastbound and westbound lanes of I-82.

In addition, crews repavinged all the on and off ramps at the Yakima Avenue / I-82 interchange and the US 12 / I-82 interchange.

Drivers now experience a smoother ride along I-82 between the Twin Bridges south of Selah and the Valley Mall Blvd. interchange.

How You Benefit
Cross GlyphImproves Safety
Resurfacing this section of I-82 provides a smoother ride for drivers.
Dollar Sign Glyph Economic Incentive
Resurfacing this section of I-82 extends the life of the roadway.

Partnerships & Cooperation

Funding

Total: $3,767,000

Contact Us
Summer Derrey, WSDOT communications
2809 Rudkin Road
Union Gap, WA 98903
509-577-1943

back to top