I-5 - NB SR 531 Vic to Stillaguamish River Vic - Paving & ADA Compliance - Complete August 2016

Overview
WSDOT contractor crews repaved 2.6 miles of cracked and rutted asphalt on northbound I-5 between SR 531 and the Stillaguamish River Bridge.
The on- and off-ramps at SR 530 and the Smokey Point Rest Area on-ramp to southbound I-5 were also repaved.

How You Benefit
Cross GlyphImproves Safety
Repaving removes cracks, ruts and potholes from the pavement where water can collect. This gives drivers a smoother, safer trip.
Dollar Sign Glyph Economic Incentive
Repaving this section of I-5 reduces the need for costly emergency repairs which can cause unwanted congestion during peak travel times.

Partnerships & Cooperation
WSDOT worked with nearby cities and transit to coordinate planned lane and ramp closures.

Funding

Financial Data for PIN 100553X, 100554J, 100554K
Funding Source  Amount ($ in thousands)
2003 Gas Tax (Nickel Funding)  $0
2005 Gas Tax (TPA)  $0
Pre-Existing Funds (PEF)  $2,720
CWA  $0
Total  $2,720