Project Title & Location
Reconstruct I-5 Interchange at NE 134th Street and NE 139th Street
|
Project Description
Reconstructs the NE 134th Street interchange at the junction of I-5 and I-205. The improvement is needed to maintain safety on I-5 and I-205 and to keep traffic moving at acceptable levels through the interchange area. It includes construction of a supplemental interchange and I-5 crossing at NE 139th Street.
|
|
Recent Progress
Construction of stage one will begin in 2009 if environmental documentation is complete, permits are acquired, design is finalized, and the county has completed the financing plan.
Design has reached 60% completion. The access hearing was held on May 23.
|
|
Environmental Impacts / Compliance
The Environmental Assessment and impact study for this project will detail the project's direct and indirect environmental impacts (natural, ecological, societal and economic) in order to guide final design and construction. This project may provide an opportunity to improve wetland habitat and storm water runoff in the project area. The Biological Assessment has been determined to need a formal consultation by NMFS.
The EA is progressing toward a final draft.
|
Impacts to Traffic
There will be impacts to traffic during construction, which will be determined as the project develops.
|