I-5 - Express Lanes Entrances - Electronic Sign Replacement

Project Phase
A small map of the electronic signs replacement project at several entrances to the I-5 express lanes in Seattle.
View larger project map

A small photo of the Columbia Street and 5th Avenue entrance to the I-5 express lanes. Entrance to the I-5 express lanes at Columbia Street and 5th Avenue.

View more photos

Status

March 2017

  • This project is scheduled to be advertised for competitive bidding in July 2017.
  • Construction is scheduled to begin in early 2018.
  • Sign up to receive email updates about this project and other King County topics.

Overview 
Most of the signs at the entrances to the Interstate 5 express lanes in Seattle were recently replaced with LED technology. However, the hardware and technology supporting the signs are in need of an upgrade. Contractor crews will replace the sign structures and brackets, along with the electrical and fiber optic systems at seven entrances to the I-5 express lanes. A few of the sign structures will also be redesigned to create a better viewing angle.

In addition, the two remaining signs that have not been updated will be replaced with LED signs. Crews will also install or modify barriers around the new sign structures at five of the entrances and restore damaged pedestrian ramps at three of the entrances to meet current Americans with Disabilities Act guidelines.

Why is WSDOT upgrading the electric sign structures at seven entrances to the I-5 express lanes?
The sign structures and brackets are more than 50 years old and past their design life. The electrical and fiber optic systems that power and communicate with the signs are also outdated and frequently fail.

Most of the signs themselves were recently replaced, except for the two at Cherry and Columbia streets at 5th Avenue. They will be upgraded to be compatible with the rest of the I-5 express lanes signage system.

The End Result
This project will increase the operational and structural reliability of the signs. Modified angles on some of the signs will make them easier for drivers to see. These upgrades improve safety at seven entrances to the I-5 express lanes. The new hardware will also reduce maintenance needs.

Project Benefits

  • Safety: Replacing the electric signage systems will increase the operational and structural reliability of the signs at the I-5 express lanes entrances. Better viewing angles on some of the signs will improve safety for drivers and pedestrians. Restoration of damaged ADA-compliant pedestrian ramps will improve the transition between the street and sidewalks.
  • Economic: Hardware upgrades, including electrical and fiber optic systems and new LED technology signs, reduce the need for emergency repairs, which are costly to taxpayers.

What is the project timeline?

  • July 2017: Project is scheduled to be advertised for competitive bidding.
  • Early 2018: Construction is scheduled to begin.
  • Summer 2018: Construction is scheduled to be complete.

Financial Information

The total estimated cost for this project is $2.9 million.