I-5 Spokane Street to I-90 Bridge Repair Facts


Traffic Data

Average number of vehicles using I-5 between Spokane Street and I-90 on a weekday.

  • Southbound I-5:  134,000
  • Northbound I-5:  126,000
  • Total:  260,000

Lane Closures

  • Total number of lanes on northbound I-5:  5 lanes
  • Lanes closed during first half of 19 day closure:  2 of 5 lanes
  • Lanes closed during second half of 19 day closure: 3 of 5 lanes (4 of 5 from midnight to 5 a.m.)
  • Number of on-ramps and off-ramps closed periodically from August 10 through 29: 5, including Spokane Street, Columbian Way and Fourth Avenue South.

    For one weekend drivers on northbound I-5 will be unable to access the northbound on-ramp to I-90 and exits to Dearborn, James and Madison streets. James and Madison streets exits will remain accessible from westbound I-90 or eastbound SR 519.

    Drivers should also expect additional nighttime closures of these ramps.

Construction Numbers

  • Number of bridge joints replaced on northbound I-5:  34 joints
  • Length of northbound joints in feet:  2162
  • Square feet of paving:  380,000 (8 3/4 acres)
  • Number of bolts needed for southbound joint repair:  700
  • Cubic feet of concrete required for paving:  between 38,000 and 56,000

Miscellaneous Numbers

  • Estimated total project cost for design and construction:  $15.5 million
  • Ranking of the I-5/I-90 interchange in 2004 list of America's worst bottlenecks by the American Highway Users Alliance:   18