WSDOT Projects

text size: T T T

I-5 Spokane Street to I-90 Bridge Repair - Alternate Routes

Alternate Surface Street Routes

map of alternate surface street routes

During the most intense period of construction on I-5 from Aug. 10 through 29 traffic will likely push out onto numerous surface streets  (pdf 173 kb) .

Alternate Highway Routes

Alternate highway routes map

During the most intense period of construction on northbound lanes of I-5 from Aug. 10 through 29 drivers will likely use numerous alternate highway routes (pdf 552 kb).

Alternate Truck, Transit and Vanpool Routes

alternate truck, transit and vanpool routes map 

A designated truck, transit and vanpool only lane will help keep traffic moving on Airport Way South.

WSDOT recommends truck drivers use one of three approved alternate routes (pdf 190 kb) from Aug. 10 through 29:

  • I-405, reconnecting with I-5 at milepost 182 (oversize vehicles permitted)
  • Exit 156 to northbound SR 599 to East Marginal Way South (oversize vehicles permitted), reconnecting with I-5 via SR 519 on-ramp to I-5
  • Exit 156 to northbound SR 599 to East Marginal Way South to Airport Way South, reconnecting with I-5 via Dearborn Avenue on-ramp to I-5

Size and weight restrictions and permitting requirements still apply.