Skip Top Navigation

I-5 - North Everett to SR 528 - ITS and paving map

The project area

We will repave a 4-mile stretch of southbound I-5 between the Snohomish River bridge and Ebey Slough bridge in Everett, and install Intelligent Transportation System (ITS) improvements along 5 miles of I-5.


Pavement life cycle

To maximize our resources and limit interruptions to traffic, we try to repave roadways at just the right time. We try to catch roadways when they have some damage, but are not so damaged that they will require additional repairs. If we wait too long to repave, the damage to the roadway can lead to even greater costs. Learn more about WSDOT's pavement management program.