Overview
We improved safety and access to and from I-5 to SR 532 and Old Highway 99 east of Stanwood with new turning lanes, signal upgrades and re-striping. Crews also reconstructed and expanded the park and ride lot, adding 49 additional parking spaces.
 | Improves Safety
We constructed turn lanes at the I-5/SR 532 Interchange and installed a traffic light at the SR 532/Old Highway 99 intersection to improve safety and reduce congestion in both of these areas.
|
 | Relieves Congestion
We reconstructed the existing park and ride lot, which helps reduce congestion by providing a way for commuters to carpool, vanpool or ride the bus.
|
 | Protects Environment
We upgraded the existing storm water system to improve water quality and enhance salmon habitat in area streams.
|
 | Economic Incentive
|
Partnerships & Cooperation
Funding
This project was funded through the following fund sources:
- 2003 Gas Tax (Nickel Funding) - $7,710,477
- Existing Funds - $406,368
- Total Funding From All Sources - $8,116,845
Contact Us
WSDOT Project Engineer Amir Ahmadi
P.O. Box 330310
Seattle, WA 98133
Phone: (425) 225-8725
E-mail: ahmadi@wsdot.wa.gov
or
Communications Travis Phelps
PO Box 330310
Seattle, WA 98133
Phone: (206) 440-4470
E-mail: phelpst@wsdot.wa.gov
back to top