We improved safety and access to and from I-5 to SR 532 and Old Highway 99 east of Stanwood with new turning lanes, signal upgrades and re-striping. Crews also reconstructed and expanded the park and ride lot, adding 49 additional parking spaces.

How You Benefit
Cross GlyphImproves Safety
We constructed turn lanes at the I-5/SR 532 Interchange and installed a traffic light at the SR 532/Old Highway 99 intersection to improve safety and reduce congestion in both of these areas. 
Car GlyphRelieves Congestion
We reconstructed the existing park and ride lot, which helps reduce congestion by providing a way for commuters to carpool, vanpool or ride the bus.
Leaf Glyph Protects Environment
We upgraded the existing storm water system to improve water quality and enhance salmon habitat in area streams.
Dollar Sign Glyph Economic Incentive

Partnerships & Cooperation

Funding
This project was funded through the following fund sources:

  • 2003 Gas Tax (Nickel Funding) - $7,710,477
  • Existing Funds - $406,368
  • Total Funding From All Sources - $8,116,845

Contact Us
WSDOT Project Engineer Amir Ahmadi
P.O. Box 330310
Seattle, WA 98133
Phone: (425) 225-8725
E-mail: ahmadi@wsdot.wa.gov

or

Communications Travis Phelps
PO Box 330310
Seattle, WA 98133
Phone: (206) 440-4470
E-mail: phelpst@wsdot.wa.gov

back to top