Skip Top Navigation

I-5 - SR 16 Realignment - HOV Structure and Connections Project Map

Project Map
To increase safety, improve mobility and reduce congestion, WSDOT is rebuilding the entire I-5/SR 16 Nalley Valley interchange. The HOV Connector project will build new bridge structures and direct-access ramps to connect I-5 HOV lanes to SR 16 HOV lanes.

Graphic of temporary alignment of I-5 near the Tacoma Mall during construction

To get a look at how lanes on I-5 and SR 16 will be configured during construction, we have provided links to conceptual before and during construction graphics. They are linked below. To use these graphics, place your curser over the white rectangle and drag your mouse up or down to view the images.