• Project Home• Construction Photos
Sign up to receive weekly e-mail updates on south King County projects.
Looking south from the S. 317th bridge. Before we can open the bridge and new HOV ramps (left), we need dry weather to re-stripe southbound I-5 and move the lanes back closer to the median.Placing button pavement markers on the newly striped HOV on-ramp to southbound I-5.Setting barrier along the new retaining wall separating the northbound and southbound I-5 lanes. This barrier was manufactured off-site to save time on installation.Steel for the approach slab, or area where the median ramps will connect to the S. 317th bridge. Crews took advantage of a single dry day on Sunday, Jan. 15 to pour the concrete.